Durrah Sugar Refinery Plant Warehouse

news-1024-726

 

Location : Saudi Arabia
Specification : DN60-DN300
Material : API 5L Gr.B PSL1
Quantity : 4000 tons
Delivery Date : May 2023
Application Field : Structural pipe

 

Durrah Sugar Refinery Plant Warehouse Project, Saudi Arabia

 

The Durrah Sugar Refinery Plant in Yanbu, Saudi Arabia, is one of the Kingdom's flagship food manufacturing projects developed under Saudi Vision 2030. Located within King Fahad Industrial Port, the state-of-the-art refinery has a production capacity of approximately 2,500 tons of refined sugar per day, supplying both the domestic and international markets. The project represents a significant investment in strengthening Saudi Arabia's food manufacturing industry and logistics infrastructure. 

 

As part of the warehouse and supporting steel structure construction, Huayang Steel Pipe supplied 4,000 tons of structural steel pipes in specifications ranging from DN60 to DN300, manufactured to API 5L Grade B PSL1 standards. All products were delivered successfully in May 2023, providing reliable structural materials for the project's warehouse system and auxiliary facilities.

 

The warehouse structures required steel pipes with excellent dimensional accuracy, stable mechanical properties, and superior weldability to support large-span steel frameworks and heavy industrial equipment. The combination of DN60–DN300 pipe sizes allowed engineers to optimize the structural design, using smaller diameters for secondary framing and bracing while larger sections provided the strength required for primary load-bearing members. API 5L Grade B PSL1 steel offered an ideal balance of strength, fabrication efficiency, and durability, making it well suited for industrial structural applications.

 

Throughout the project, Huayang maintained close communication with the customer during production planning, quality inspection, packaging, and shipment. Every steel pipe underwent comprehensive quality control procedures, including dimensional inspection, weld examination, non-destructive testing, and mechanical property verification to ensure consistent quality and compliance with project specifications.

 

Project Information

 

Item Details
Project Durrah Sugar Refinery Plant Warehouse
Location Yanbu, Saudi Arabia
Application Structural Pipe
Material API 5L Grade B PSL1
Specification DN60–DN300
Quantity 4,000 Tons
Delivery Date May 2023