When steel pipe is completed and operational, it is the result of cooperation between a number of parties in the supply chain. These parties perform steps which are sequential and overlapping involved in the design, manufacturing, blasting, coating, handling, storage, transport and construction of steel pipe.
1. FINAL TEST-- Pipe on warehouse



2.FINAL TEST



3. LOADING ON TO THE TRUCK



4. LOADING ON TO THE TRUCK



5.Pipe Protection
Pipe-end protection is advisable in case the pipe-ends are bevelled at the pipe manufacturer. In the case of overseas transport, there is an especially increased risk of damaged pipe-ends. This is caused by extra handling procedures in ports and shifting of the pipes onboard vessels.
In addition to end caps or protective rings, external wrapping with protective cloth can be applied along the pipe body. This wrapping helps to safeguard the coating surface from scratches, moisture, and contamination during long-distance transportation or prolonged outdoor storage. Especially for coated or painted pipes, the additional protective cloth layer significantly reduces the risk of mechanical damage, UV exposure, and corrosion initiation, ensuring the pipes arrive at the destination in optimal condition.




6.Advanced Anti-Corrosion Coating
Huayang Steel Pipe has introduced a state-of-the-art anti-corrosion production line, benchmarked against the most advanced facilities in China. The line is equipped with premium international technology, including German KraussMaffei extruders, Swiss Gema spray guns, and American Graco liquid epoxy coating systems. We are capable of providing multiple coating options such as 3PE, 2PE, FBE, 2PP, and 3PP. With comprehensive laboratory testing and inspection methods in place, we ensure that every pipe meets the highest quality standards from production to final delivery.